Dredging vessel engineering construction should follow the principle Factory Suppliers Manufacturers Quotes

News

Home>News > Industry News
Industry News

Dredging vessel engineering construction should follow the principle

Dredging vessel engineering construction should follow the principle

 Dredging project construction must comply with the following criteria in groundwater use planning:
(1) Dredgers should fully use surface water and rationally develop groundwater, so that groundwater and surface water can be co-ordinated;
(2) The number of wells in each layer and the amount of excavation should be determined according to the replenishment capacity of each aquifer, so that water can be stratified, shallow, medium and deep combined, and rationally distributed;
(3) It must be integrated with the management of drought, alkalized and salty soils to ensure both irrigation and groundwater level and alkali and stain prevention; Surface runoff and create conditions for the treatment of alkaloids.
In the process of using groundwater for dredging vessel construction, management must be strengthened to prevent blind excavation and cause adverse consequences. Shallow groundwater refers to diving that is directly connected with local precipitation and surface water, and weak confined water that is closely connected with diving. Other water source projects include water collection projects, sewage treatment and reuse, and seawater use. Rainwater harvesting refers to manual collection of storage roofs


Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Subject :
* Email :
  • Name :

  • Phone:

  • *Message :
    Message